The project includes the construction of buildings and facilities needed for hard resin production that consists of:

• Production and warehouse building intended for the production of solid resins (rosin pentaerythritol esters) and turpentine • Turpentine filling platforms (a canopy equipped with a device for bottom sealed filling of tankers; a mini fuel filling station in the metal box with a fuel filling nozzle) • A storage of liquid components (underground turpentine storage tanks (two tanks of volume 50 m3), an emergency drain tank, production engineering support structures (railway trays with pipelines for pumping turpentine from/into production) • A standalone gas process boiler with a steam generator and a thermal oil boiler • 10/0.4 kV transformer substation • MEP (Mechanical, Electrical, Plumbing)

Services

• Survey Works; • Environmental Protection and Ecological Passport development; • Environmental Impact Assessment; • Architectural Design; • Structural Design; • Construction Supervision.

Project information

Project's name

Rosin plant

Status

Completed

Construction time

01.01.2017 - 01.01.2019

Building type

7120 Industrial production sites

Specific BIM

BIM version

Big BIM

BIM-Cooperation

BIM mit REVIT

Software

Revit

Application

3D 4D 5D 6D 7D

LOD

100 200 300 400 500